Submittal Version Control: How to Track Revisions and Prevent Outdated Documents
Submittal Version Control: How to Track Revisions and Prevent Outdated Documents
A product submittal is returned with comments. An RFI changes the specified installation method. The project manager updates the package and resubmits it.
Two days later, purchasing opens the original attachment.
The result may be the wrong product order, an avoidable review cycle, or installation based on superseded information. Submittal version control keeps each submission, reviewer comment, revision, and approval connected so the project team can identify the document currently authorized for use.
What Is Submittal Version Control?
Submittal version control is the process of tracking a construction submittal from its first issue through each revision and final approval.
Each record should identify:
Original submittal number
Current revision number
Submission and response dates
Reviewer comments
Related RFI responses
Approval status
Superseded versions
File names such as “Final,” “Final Updated,” and “Final 2” do not show which package was reviewed or why it changed.
Where Revision Control Breaks Down
A common review sequence looks like this:
Submittal 01 → RFI 04 → Submittal 01, Revision 1
The RFI may clarify a product requirement, installation detail, or specification conflict. If that response is separated from the revised package, the reviewer must reconstruct the reason for the change. If the first submission remains active in an email inbox or shared folder, someone may order from it.
Earlier versions should remain available as project records, but they must be clearly marked as superseded.
One Record, Not Several Email Threads
During his FloorDaily.net podcast appearance, Spec-ID Marketing Director Tom Ellis described the value of a “single source of truth” for project managers and coordinators.
A team should not need to compare attachments, spreadsheets, and local downloads to determine which submittal is current.
A centralized record should show the active revision, review status, date of each response, and documents that prompted the change. That gives salespeople, project managers, purchasers, and field teams the same approved information.
What Effective Submittal Version Control Requires
Use one numbering convention across the project. Date-stamp each submission and response. Keep reviewer comments with the applicable revision. Attach the RFI response that caused a change. Mark outdated packages as superseded, and restrict their use for purchasing or installation.
These controls reduce repeated reviews and ordering mistakes while preserving the record of what was submitted, changed, and approved.
Frequently Asked Questions
How should submittal revisions be numbered?
Use a consistent sequence such as Rev 0, Rev 1, and Rev 2 under the original submittal number.
Should superseded submittals be deleted?
No. Retain them for the project record, but prevent them from being mistaken for the active submission.
What is the difference between a revision and a resubmittal?
A revision is the changed package. A resubmittal is the act of sending that revision back for review.
Keep the Approved Record Easy to Find
Spec-ID’s submittal software centralizes product data and helps contractors create and manage automated submittal packages without rebuilding records from scattered files.